Reaction to Tariffs Keep Freight Costs High
November 23, 2018 | IHS MarkitEstimated reading time: 2 minutes
Construction costs increased once again in November, according to IHS Markit and the Procurement Executives Group (PEG). The current headline IHS Markit PEG Engineering and Construction Cost Index registered 58.3 this month, slightly lower than last month’s reading. Although prices are still rising, indicated by an index reading above 50, increases have been less widespread in the last two months.
Materials and equipment prices rose once again in November, though at a slower rate than October with the index posting 58.7, down from the October figure of 61.3. Price increases for materials and equipment were recorded in 11 of the 12 subcomponents in November; only turbines had flat pricing. Compared to last month, copper based wire and cable, heat exchangers and pumps had large gains. All other categories, although still above 50, lost some of their pricing power. The index for ocean freight transportation hit high levels in September and the diffusion index still hovers above 70.
“Shipping prices remain elevated, but some of the pressures that caused capacity strains earlier this year have partially subsided,” said Kayla Bruun, senior economist, pricing and purchasing, IHS Markit. “Over the summer, carriers cut capacity on trans-Pacific and Asia-European routes just as demand ramped up quickly and unexpectedly. The announcement of U.S. tariffs on Chinese goods caused importers to rush in shipments ahead of the implementation date, resulting in the peak shipping season moving up one month to July rather than August. Since then, volumes have retreated and carriers are keeping additional capacity available through the end of the year to accommodate any uptick in demand associated with the tariff rates increasing from 10% to 25% in January 2019.”
Current subcontractor labor prices increased at a slightly quicker pace this month, with the index reaching 57.3 from 56.2 in October. Labor costs were flat in U.S. Northeast and West but continued to increase in U.S. South and Midwest. In Canada, the Eastern part of the country registered higher labor costs, while for the West labor costs dropped.
The six-month headline expectations for construction costs index reflected expectations of increasing prices for the 27th consecutive month. The materials/equipment index fell back once more but stayed in expansion territory with a reading of 69.6. Expectations for future price increases were widespread, with all material indexes resting above 55.0. Price expectations for sub-contractor labor gained a few points and once again moved above 70. Labor costs are expected to rise in all regions of the U.S. and Canada.
In the survey comments, respondents indicated a tight labor market for all skilled trade workers as well as some tightness with regards to steel.
About IHS Markit
IHS Markit is a world leader in critical information, analytics and solutions for the major industries and markets that drive economies worldwide. The company delivers next-generation information, analytics and solutions to customers in business, finance and government, improving their operational efficiency and providing deep insights that lead to well-informed, confident decisions. IHS Markit has more than 50,000 business and government customers, including 80 percent of the Fortune Global 500 and the world’s leading financial institutions.
Suggested Items
Trouble in Your Tank: Supporting IC Substrates and Advanced Packaging, Part 5
03/19/2024 | Michael Carano -- Column: Trouble in Your TankDirect metallization systems based on conductive graphite or carbon dispersion are quickly gaining acceptance worldwide. Indeed, the environmental and productivity gains one can achieve with these processes are outstanding. In today’s highly competitive and litigious environment, direct metallization reduces costs associated with compliance, waste treatment, and legal issues related to chemical exposure. What makes these processes leaders in the direct metallization space?
AT&S Shines with Purest Copper on World Recycling Day
03/18/2024 | AT&SThe Styrian microelectronics specialist AT&S is taking World Recycling Day as an opportunity to review the progress that has been made in recent months at its sites around the world in terms of the efficient use of resources:
Matrix to Exhibit at IPC APEX EXPO 2024 in Anaheim, CA
03/05/2024 | MatrixMatrix will be exhibiting at IPC APEX EXPO 2024, to be held on April 9-12, 2024, at the Anaheim Convention Center, Anaheim, CA.
The Chemical Connection: Getting to Know Your Vendor
02/16/2024 | Don Ball -- Column: The Chemical ConnectionAfter working for a capital equipment supplier for almost 50 years, I’ve found that the most important part of getting to know your vendor is good communication among all parties. While contact between fabricators of a constantly changing product line and the designers of those products may occur daily or weekly, conversations between you and your equipment supplier may be years apart. That lengthy gap often means that previous contacts may have been promoted, retired, or moved on to other opportunities. You may have also migrated to a new supplier with whom you have little or no history. In either case, you will be interacting with someone you are unfamiliar with (as they are with you). Therefore, it is essential for both sides to communicate clearly so expectations will align.
EIPC Winter Conference 2024, Day 2: A Closer Look at Global Trends
02/14/2024 | Pete Starkey, I-Connect007The opening session of the second day’s conference proceedings focused on global PCB trends and was introduced and moderated by Dr. Michele Stampanoni, vice president of strategic sales and business development at Cicor Group in Switzerland. He opened the session with Dr. Hayao Nakahara’s knowledgeable and enlightening video presentation on the IC substrates industry.