Camtek Receives Orders for 34 Systems From 5 Leading CMOS Image Sensors Manufacturers


Reading time ( words)

Camtek Ltd., today announced that it has received orders for 34 systems for 2D inspection of CMOS image sensors from five leading manufacturers, of which 25 are from two customers.

Most of the orders are expected to be installed during the first half of 2020.

These orders strengthen Camtek’s position in the 2D inspection field with the EagleT and newly launched EagleTPlus thereby maintaining the company’s position as a leading expert in the inspection of CMOS image sensors.

Ramy Langer, Chief Operating Officer, commented, “Cameras are one of the most critical differentiating components in today’s smartphones. The increased number of cameras in smart-phones, smaller pixel size and the emerging 5G, which drive new smartphone manufacturing, are setting new requirements and standards for the inspection of CMOS image sensors. Our longstanding expertise in inspection technologies designed specifically for the CMOS image sensors market, makes the EagleT and EagleT Plus the ultimate inspection tools for this market.”

Rafi Amit, Chief Executive Officer, added, “I am very pleased with the strong start of 2020. These high-volume orders, together with other orders we have recently received for other applications, signal a positive change in the trends in our market, demonstrating the growing demand for inspection and metrology equipment and improving our visibility for the first half of 2020.”

Share

Print


Suggested Items

Burt Rutan’s Keynote: SpaceShipOne

03/02/2020 | Pete Starkey, I-Connect007
In this video clip from his presentation, Burt Rutan discusses some of his aircraft’s revolutionary flights that drew the most public attention, including SpaceShipOne, which flew three of the five manned space flights launched by man in 2004. He also explains the benefits of working with Microsoft’s Paul Allen, who agreed to fund SpaceShipOne based on a simple handshake.

Uncertainties in the Market Rise while a Bounce in NAND Flash Prices Remains Unlikely in 3Q

06/20/2019 | TrendForce
According to the latest investigations by DRAMeXchange, a division of TrendForce, demand for smartphones and servers go below expected levels in 2019 as the US-China trade dispute heats up.

NASA Awards Artemis Contract for Lunar Gateway Power, Propulsion

05/27/2019 | NASA
In one of the first steps of the agency’s Artemis lunar exploration plans, NASA announced the selection of Maxar Technologies, formerly SSL, in Westminster, Colorado, to develop and demonstrate power, propulsion and communications capabilities for NASA’s lunar Gateway.



Copyright © 2020 I-Connect007. All rights reserved.